Residential

Home / Residential

West Malling: Full house renovation

Full-renovation of large 6 bedroom, 5 bathroom property.  The property had been left empty for 2 years after the previous owner ran out of money attempting a renovation.  The new owner engaged us to fully renovate the internal finishes including: (Landscaping is by the client.)

  • Strip out of existing fixtures fitting, electrics, plumbing etc
  • Full re-wire
  • Full re-plumb including new wet underfloor heating to ground floor.
  • New bathrooms suits.
  • New tiling to bathrooms.
  • New tiling to ground floor tiling.
  • New kitchen.
  • New ceilings where missing.
  • Re-plaster walls and ceilings where necessary.
  • New utility room.
  • New solid oak staircase.
  • New solid oak feature window.
  • New flat roof covering.
  • New balcony handrail detail.
  • New balcony roof covering suitable for walking on.
  • New 4m x 2m flat rooflight laten and associated structural works.
  • New 1m x 18m flat roof canopy extension.
  • New tile hanging to the front elevation of the building.
  • All new doors and frames.
  • Multiple complex structural repairs.

This project is ongoing stating in July 2023 due to finish in January 2024.

Clearance site preperation

Insulation materials

Oak window

Roof & Plumbing